Project Control System

Systems
Practice
My part
Built
In development2026

A project control system that sits between the Primavera P6 programme and the site, so the plan and the work on the ground are read together.

  1. P6 programme
  2. Ready work
  3. Field evidence
  4. Blockers
  5. Progress that holds up

The problem

The programme says what should happen. The site knows what did. Between the two, progress gets argued instead of shown.

What it does

It turns the programme into work the site can start, collects field evidence against each activity, records what blocks it, and reports progress that holds up. Materials enter as readiness, not as accounting.

Where it stands

In development. Next: the first acceptance test on a real project.