Portfolio

Architecture
Process, student work

How I read a site before I draw on it. This page is the process, not the projects.

Solid and void drawing: buildings in black, open ground in white, around the Valens Aqueduct in Istanbul.
Solid and void Not a survey, shown without a scale

1 of 3 Read the ground

Black is built. White is open. Reverse it and the open ground becomes the figure.

2 of 3
Walk it

Lining the route, or seen from it.

A mental map of Fatih, Istanbul, around the aqueduct. It separates the buildings that line a walked route from the buildings that are only seen from it.

3 of 3
From reading to decision

  • Keep a public route. Street, public interior, open ground. Free entry stays legible when the hall is booked.

  • Keep the aqueduct independent. The new building stands clear of the monument.

  • Make water a shared space. One water element links at least three parts of the programme.

Comparative hypotheses from the first critique, not a selected design

The brief
Water in Common

A mixed-use public building beside the Valens Aqueduct. About 2,750 m² of programme, a hall for 200 people, and water that has to connect at least three parts of it. A student project, in progress.

Read the project

Business development is a design problem. It starts by reading the situation.

See the work

Contact
First enquiry to delivery

Where does your firm lose it? Mark the point

Choose a point on the line.

The positioning is unclear. I read who decides and what they need to believe, then sharpen the positioning.

A first line you can send

Our positioning is unclear. I would like your read on it.

The proposal is late. I build the proposal and the presentation, in Arabic and English, each written for its own reader.

A first line you can send

Our proposals go out late. I would like your read on it.

The follow-up never comes. I set up the follow-up so it happens.

A first line you can send

Our follow-up never happens. I would like your read on it.

Delivery runs on slow, disconnected systems. I rebuild them: project controls, estimation and the tools around them, for lower cost and faster delivery.

A first line you can send

Our internal systems slow delivery down. I would like your read on it.

Message me on LinkedIn